JXSC telah merancang Diagram Alir yang lengkap dan menyediakan satu set lengkap mesin pabrik pengolahan & semua aksesori untuk rock gold processing in Congo. We offer a detailed layout design with base construction drawings accordingly.
30 TPH Rock Gold Processing in Congo
Published Date:31 Juli 2025Situasi Tambang Klien
- The processing capacity required is 30TPH.
- The raw material is rock gold.
- According to the rock ore information obtained from the customer, the rock needs to be ground to a final size of 0-1mm to release gold from the rock.
30 TPH Rock Gold Process Plant Flowchart

Rock Gold Processing Plant Equipment
- Pengumpan getaran
- Primary jaw crusher & fine jaw crusher
- Layar bergetar
- Pabrik bola
- Konsentrator sentrifugal emas
- Meja goyang
- Kotak pintu air
- Slurry pump & water pump
- Konveyor sabuk
- Tungku peleburan emas
Deskripsi Flowchat
Step 1. Feeding System
- Front-end loaders/dump trucks feed raw ore into the hopper.
- Pengumpan bergetar ensures steady and controlled material flow to the primary crusher.
- Pengumpan elektromagnetik precisely regulates feed rates for downstream crushing and grinding.
Step 2. Crushing Stage (Two-Stage Crushing)
- Primer Penghancur Rahang: Breaks down large rocks (<340mm) to intermediate sizes (<100mm).
- Fine Jaw Crusher: Further reduces material to 0-30mm via belt conveyor.
- Key Advantage: High reduction ratio (1:10), ideal for hard quartz gold ore.
Step 3. Screening Process (Closed-Loop Control)
- Layar bergetar classifies 0-30mm material:
✓ Acceptable size (0-20mm): Sent to grinding via transfer bin.
✓ Oversize (+20mm): Recycled to a fine jaw crusher. - Quality Control: Ensures optimal grinding feed size (≤20mm).
Step 4. Grinding Circuit (Gold Liberation)
- Ball Mill: Wet grinds 0-20mm ore to 0-1mm slurry (-200 mesh, >85% passing).
- Critical Outcome: Achieves 90%+ gold liberation from host rock.
Step 5. Gravity Separation (3-Stage Recovery)
- Primary Concentration: Centrifugal concentrator upgrades slurry to high-grade concentrate.
- Secondary Upgrading: Meja goyang further purifies the centrifugal concentrate for direct smelting.
- Tailings Recovery: Sluice box scavenges residual gold from centrifugal tails.
- Recovery Rate: 80–90% overall (ore-dependent).
Final Product
Gold concentrate is smelted into gold bars.
30tph rock gold gravity separation System Advantages
- Optimized Flow – Modular 5-stage design adapts to varied gold-bearing ores (e.g., auriferous pyrite-quartz).
- High Recovery – Three-stage gravity separation + precise grinding (tailings grade <0.5g/t).
- Cost Efficiency:
- Power consumption: ≤25kWh per ton.
- Wear parts lifespan: Jaw plates (6–8 months), grinding media (12 months).
- Automation – Flow monitoring at key nodes.
Produksi & Pengiriman

JXSC adalah produsen peralatan pertambangan profesional & ahli solusi bijih pertambangan. Ini memiliki banyak kasus yang berhasil seperti pabrik emas, solusi berlian, dll., Jika Anda membutuhkan layanan seperti itu, silakan hubungi kami.