JXSC telah merancang Diagram Alir yang lengkap dan menyediakan satu set lengkap mesin pabrik pengolahan & semua aksesori untuk alluvial chrome processing in Zimbabwe. We offer a detailed layout design with base construction drawings accordingly.
40 TPH Alluvial Chrome Processing in Zimbabwe
Published Date:22 Mei 2025Situasi Tambang Klien
- Kapasitas pemrosesan yang dibutuhkan adalah 40TPH.
- The raw material is alluvial chome.
40 TPH Alluvial Chrome Ore Process Plant Flowchart
Chrome Processing Plant Equipment
- Layar trombon
- Saluran spiral
- Pompa lumpur
- Pemisah magnetik
Deskripsi Flowchat
Step 1: Raw Material Feeding
The raw alluvial chrome ore is fed into the processing plant system through a feeding hopper or conveyor.
Step 2: Washing and Screening
The raw ore enters a layar trompet where washing takes place. This equipment:
- Washes the ore material to remove clay and other impurities.
- Screens out waste material and oversized particles.
- Allows properly sized material to pass through as an underscreen product.
Step 3: Slurry Pumping
The underscreen material (washed and properly sized ore) is pumped as slurry to the gravity separation circuit using pompa lumpur.
Step 4: Gravity Separation
The slurry is processed through saluran spiral for gravity concentration:
- Heavy chrome minerals are separated from lighter gangue minerals.
- The spiral chute provides high-capacity processing with effective separation.
- In this setup, a single-stage spiral system is utilized due to the high-grade nature of the raw ore.
Step 5: Magnetic Separation
The concentrate from the spiral chutes is directed to wet magnetic separators:
- This customized step removes iron contaminants from the chrome concentrate.
- Improves the quality and purity of the final chrome product.
Step 6: Tailings Management
The tailings (rejected material) from the spiral separation process are pumped to a tailings pond for proper disposal and water recovery.
Step 7: Product Collection
The final chrome concentrate (after magnetic separation) is collected as the finished product, ready for further processing or market.
Catatan:
For lower-grade raw ore, a two-stage spiral configuration is recommended:
- The first stage separates the initial concentrate.
- Middling materials from the first stage are pumped to the second-stage spirals.
- This configuration achieves a higher overall recovery ratio.
Produksi & Pengiriman
JXSC adalah produsen peralatan pertambangan profesional & ahli solusi bijih pertambangan. Ini memiliki banyak kasus yang berhasil seperti pabrik emas, solusi berlian, dll., Jika Anda membutuhkan layanan seperti itu, silakan hubungi kami.
Produk Terkait
Hubungi Kami Sekarang
Jika Anda memiliki pertanyaan tentang produk kami, silakan isi formulir di bawah ini, dan kami akan menghubungi Anda dalam waktu 24 jam. Yakinlah bahwa kami tidak akan mengungkapkan informasi Anda kepada siapa pun.