JXSC has provided a complete set of washing, screening, crushing, and gravity separation machines & all accessories for the alluvial tin processing in Uganda. We offer a detailed layout design, along with base construction drawings, and send the engineers to install the machines.
30TPH Alluvial Tin Processing Plant in Uganda
Published Date:09 enero 2026Compartidor: Jenny
Proyecto: 30TPH Alluvial Tin Processing Plant
Ubicación del proyecto: Uganda
What Does Jenny Say?
30 TPH Alluvial Tin Process Plant in Uganda
1. Customer’s Tin Project Information
Ubicación: Uganda
Raw ore condition: Alluvial tin mainly with a lot of sticky clay, with coarse tin concentrate and fine tin concentrates as well. Need to enrich coarse tin concentrate into fine powder to improve the grade.
Principales requisitos del cliente: 30tph, a higher recovery rate as possible. High configuration. We need a máquina deshidratadora to recycle water and tailing sand with reduced moisture content.
2. Our Process Design & Solution
Process Description
Stage 1: Primary Screening & Classification
- Excavators load raw ore into vibrating feeders equipped with 70mm grizzly screens
- Sub-70mm material passes through for scrubbing, while oversize is rejected
- The trommel scrubber features dual screening layers (7mm and 25mm apertures)
- Output produces three classified fractions: 0-7mm, 7-25mm, and +25mm materials
Stage 2: Multi-Stage Jig Separation System
- +25mm fraction diverted directly to stockpile via conveyor belt
- 7-25mm fraction undergoes primary jig separation:
1. Rougher plantilla produces initial concentrate for cleaning jigs
2. Closed-circuit design maximizes mineral recovery - 0-7mm fraction processed through dedicated jig circuit:
1. Separate the rougher jig from the cleaner jig refinement
2. Scavenger jig processes rougher tailings
Stage 3: Concentrate Dewatering & Preparation
- All jig concentrates first pass through dewatering screens
- Screen oversize is conveyed to the hammer crusher for size reduction
- Screen undersize is pumped to the mixing tank as slurry
- Crusher discharge flows by gravity to the same mixing tank
Stage 4: Final Concentration & Refinement
- Shaking tables upgrade concentrate purity
- Dried table concentrate passes through triple-disc dry magnetic separators
- Final product: High-grade tin concentrate
Stage 5: Tailings Management System
- Combined jig and table tailings processed through:
1. Spiral dewaterers for moisture reduction
2. High-frequency vibration screens - Produces two tailings products:
1. Coarse sand fraction
2. Fine sand fraction
Process Flowchart

Main Equipment List
- Alimentador vibrante
- Jig concentration
- Trituradora de martillos
- Spiral washer
- Criba de deshidratación
- Mesa vibratoria
- Cintas transportadoras
- Pumps
3. Customer Questions & Our Answers
Question: Can JXSC provide an agitated feed tank for the shaker table?
Contesta: Yes, we can provide the agitated feed tank before the shaker table.
Question: Control panel layout Diagram
Contesta: We can provide the electric control panel, just additional cost will be needed. The electric wire & cable layout will be provided after the order is placed.
Question: Installation/construction Schedule
Contesta: Installation time around 1.5 months, based on all things being ready at your side and your workers being cooperative, etc.The time for reference
Question: Provide a basic labour schedule for the operation of the plant
Contesta: Total at least 5 persons are needed to run the plant.
1 manager
1 for feeding + trommel
1 for jigs
1 for mesa vibrante + crusher
1 for spiral washing +vibration screen
Questions: Sand Pump Curves
Contesta: See the individual attachment for your reference.

4. Production, Shipping & On-site

Manufacturing Photos

Delivery Photos

This project underscores JXSC’s capability to deliver high-recovery, low-waste solutions for alluvial tin miners, combining robust equipment with adaptable processes for varied ore profiles.
Key Process Achievements
- Advanced trommel scrubbing system with dual-layer screening (7mm/25mm) effectively removed sticky clay and pre-classified ore.
- Multi-stage jigging circuit (roughing—cleaning—scavenging) maximized recovery of coarse and fine tin particles.
- Integrated dewatering & water recycling (spiral dewaterer + high-frequency screens) reduced tailings moisture and minimized water waste.
- Final purification via shaking tables and dry magnetic separators ensured high-grade tin concentrate output.
Client-Centric Design Highlights
- Scalable configuration: Modular layout allows future capacity upgrades.
- Labor-efficient operation: Streamlined workflow requiring only 5 personnel for full plant control.
- Customized automation: Optional agitated feed tanks and electric control panels provided for stable shaker table performance.
Why The Client Chose JXSC?
① Clay-handling expertise: Specialized trommel scrubber and jigging loops adapted to Uganda’s challenging alluvial ore.
② Water management focus: Closed-loop dewatering system met environmental and operational demands.
③ Proven African experience: Turnkey delivery from engineering to commissioning within 1.5 months, supported by detailed technical documentation (e.g., sand pump curves, labor schedules).



JXSC es un fabricante profesional de equipos de minería y experto en soluciones de mineral de minería. Tiene muchos casos de éxito, tales como plantas de oro, soluciones de diamantes, etc., Si necesita un servicio de este tipo por favor. Contacto.
Productos relacionados
Póngase en contacto con nosotros
Si tiene alguna pregunta sobre nuestros productos, no dude en completar el formulario a continuación y nos comunicaremos con usted dentro de las 24 horas. Tenga la seguridad de que no revelaremos su información a nadie.