Q1: Why does this customer want the factory to fabricate the steel structure completely before shipment? Because usually, customers weld it themselves on-site, with the factory only supplying the steel materials.
A: Because labor costs in Australia are very high; for example, a skilled welder earns approximately 700-1000 Australian dollars per day.
Q2: What kinds of feeding method for this 30TPH Rock gold processing plant? Trucks, excavators?
A: Manual truck feeding raw material.
Q3: With truck feeding, what size should the raw material silo be designed for a capacity of 30 TPH?
A: Working 10 hours per day, need 25m3 raw hopper.
Q4: How will the 25m3 large storage bins be shipped after welding?
A: The factory welds and assembles a complete hopper, then cuts it in half and ships it in 40FR containers.
Q5: When ordering a customized fábrica de processamento de minério de ouro, what supporting services will the manufacturer provide? Is technical support available afterwards?
A: Pre-sales: We have a dedicated laboratory where customers can send ore samples.
Our factory will conduct mineralogical analysis and small-scale tests, design a customized beneficiation process and equipment configuration plan, and provide detailed process flow diagrams and investment budgets.
After placing an order, we arrange equipment production, transportation, and send 1-2 engineers for on-site installation and commissioning. A professional technical team provides comprehensive guidance to ensure the equipment is put into normal operation. We also train mine operators to master equipment operation and daily maintenance skills.
After-sales: To ensure long-term stable production at the mine.
We provide 24-hour online technical support to address technical problems during production. A professional technical team provides comprehensive guidance to ensure the equipment is put into normal operation.
Q6: What specific role does the fine sand recovery integrated machine play in the tailings dewatering process of a hard rock gold processing plant?
A: The fine sand recovery integrated machine is the core equipment for dewatering and dry discharge of hard rock gold tailings. It is designed to address the problem of high proportions of fine sand (0.074~0.5mm) and associated fine gold particles in hard rock gold tailings, where fine sand is easily lost with the tailings water. In the tailings dewatering process, it performs three core functions: dewatering, fine sand recovery, and water recycling.