newbg

Comment installer, déboguer et faire fonctionner un filtre-presse en toute sécurité ?

Date de publication:14 juillet 2022

As modern infrastructure projects continue to expand—including building construction, bridge foundation works, mining, tunneling, and municipal engineering—large volumes of slurry and construction mud are generated during the piling process. Direct discharge of this wastewater can cause serious environmental pollution and often fails to meet local environmental regulations.

A filtre-presse is one of the most effective dewatering solutions for separating solids from slurry before disposal or recycling. To ensure reliable performance, long service life, and operator safety, proper installation, commissioning, and operation are essential.

This guide explains how to install, debug, and safely operate a filter press.

 

Comment installer un filtre-presse ?

Proper installation is the foundation for safe and efficient operation.

1. Transport and Lifting

Lors du chargement et du déchargement, il convient de hisser la structure aux extrémités de deux poutres. Figure 1).diagramme de chargement et de déchargement du filtre-presse

2. Foundation Installation

The filter press should be installed horizontally on a concrete foundation, and secondary grouting is requested.

Please Note:

  • The support under the end plate should be fixed using screws.
  • The support under the cylinder does NOT need to be fixed and does NOT need to be buried by concrete to ensure the beam is flexible during working.
  • There should be about 1 meter (3.3 ft) around the structure for workers’ operations.
  • Les Installation du filtre-presse doit être éloigné de la corrosion, de la pluie et du soleil.

3. Electrical Connection

  • Ensure the 3-phase power is properly installed.
  • The motor on the hydraulic station should run CLOCKWISE.

4. Fill Hydraulic Oil

Fill 76 # or 46 # hydraulic oil into the tank.

Requirements:

  • Maintain an oil level approximately 40 mm below the tank opening.
  • During first-time operation, operate the hydraulic cylinder several times to remove trapped air.
  • Refill hydraulic oil if necessary after the cylinder cycles.
  • Release the pressure gauge during the initial closing process to vent air from the hydraulic system.

5. Install the Feed Pipeline

The feeding pipe should include a backflow pipe, shut-off valve, and pressure meter.
Remarque : Ensure all high-pressure and low-pressure hydraulic pipelines are connected correctly.

6. Install Filter Cloths

Filter cloths should be installed flatly.

7. Connect the Feed Pump

If using a pneumatic diaphragm pump or screw pump as feeding pumps:

(1)Pneumatic diaphragm pump: the air pressure should be more than 0.8 MPa, and there must be a relief valve. The pump can be directly connected with the slurry tank and the inlet of the filter press. And there should be a pressure meter (0-1.2 MPa) in order to observe the feeding pressure.
(2)Screw pumps or other sludge pumps: return valve and backflow pipe are also necessary, and there should also be a pressure meter (0-1.2 MPa).

8. Final Inspection

After installation, please check whether the filtering system and pipelines meet the requirements. After confirmation, the product can be used.

Remarque : For Manual Jack Filter Press, no need to consider steps 1, 2, 3, and 1, 2, 4.

Filtre-presse

Comment déboguer le filtre-presse ?

Commissioning should only be performed after installation has been completed.

Préparation du débogage

  • Please check whether the fasteners whether in good condition and if circuits of oil and electricity circuits are correctly installed.
  • Please check that all driving parts are working smoothly and that the high- and low-pressure oil pipelines are installed correctly.
  • Please confirm the cloths are installed flatly.

Procédures de débogage sûres

  • If the operator does not know the machine’s performance and operation rules, they must not operate the machine without authorization.
  • En cas de fuite ou de situation anormale (fonctionnement peu fiable, bruit important, vibrations, etc.), éteignez immédiatement la machine et résolvez le problème.
  • Pendant le travail, l'examen et la réparation ne sont pas autorisés.
  • La machine ne doit pas fonctionner sous une pression d'alimentation élevée.
  • Ne réglez pas la soupape de sûreté à la légère.

 

Sécurités pendant l'utilisation

Follow these operating precautions to ensure safe and reliable filtration.

1. Filter Plates: Always install the specified number of filter plates; Never operate the filter press with fewer plates than required.

2. Hydraulic Pressure: Hydraulic cylinder pressure must never exceed the rated operating pressure; Excessive pressure may damage hydraulic components and filter plates.

3. Valve Operation: Valves for filtered liquid, washing liquid, and compressed air must operate according to the procedures and must not turn on at the same time.

4. Slurry Temperature: The slurry temperature must be controlled under 80℃; if it’s beyond 80℃, please inform us in advance.

5. Moving Filter Plates: Lors du déplacement des plaques, la force doit être régulière et appropriée afin d'éviter d'endommager les plaques et les poignées.

6. Cleaning After Filtration: After filtration, plates and cloths must be washed clean. There should be no residues on the surface; otherwise, it might cause deformation.

7. Filter Cloth Maintenance: The filter cloth must meet the requirements of the slurry; otherwise, the filtrate will not be clear, or the filtering speed will be too slow to get the best filtering effect. After a period of working, the filter cloth will be hard, and its performance might decrease, so it’s necessary to conduct a routine inspection. If clothes become hard, please neutralize, immerse, and wash it using the corresponding weak acid or alkali.

8. Hydraulic System Maintenance: Hydraulic parts, such as the oil tank, cylinder, oil pump, relief valve, etc., should perform some no-load running regularly. Normally, for the first use, the oil should be changed in one month. Then every 6 months, the oil should be changed one time. The filtering precision should be 20 um.

9. Lubrication: Keep the machine clean and properly lubricated; Apply grease to threaded components and use lubricating oil on the plate shifting and drive mechanisms; Avoid stepping on or striking inlet and outlet pipelines, as this may cause leakage at pipe joints.

 

Précautions de sécurité

  1. Les opérateurs doivent être formés à l'utilisation de la machine.
    Operators must know the basic operation processes and daily maintenance of the filter press to avoid harm caused to workers and our product.
  2. Please turn off the power after work and during maintenance.
    When a malfunction occurs, please turn off the power.
  3. Ne démontez pas le système hydraulique et le système électrique sans formation.
    The electricity of the hydraulic system and electrical control system has high voltage; please do not disassemble them without authorization.
  4. Please do not adjust the transducer’s position and meter’s parameters without authorization.
    Les réglages d'usine ne peuvent être modifiés sans autorisation. C'est dommageable pour le filtre-presse.
  5. Veuillez faire très attention aux pièces rotatives afin d'éviter les blessures.
    Ne touchez pas les pièces rotatives pendant le travail afin d'éviter les blessures.
  6. Veuillez porter un dispositif de protection approprié
    Dans certaines situations particulières, les opérateurs doivent porter des dispositifs de protection.

 

Le pipeline du filtre-presse

Filtre-presse Pipeline

 

Procédures de fonctionnement

  1. Fermer et presser les plaques.
  2. Open valve 4, shut off valve 3.
  3. Arrêter la pompe d'alimentation.
  4. Observe the pressure during the whole filtration course. According to the on-site situation, please ensure the feeding pressure is under the rated pressure by adjusting the return valve.
  5. Finally, the filtered liquid will be little, then please close the feeding pump. If the cake does not need washing, please discharge the cake.
  6. When opening the plates, if the cake is not dry enough, the plates can also be closed and continue to work again.
  7. Si la pompe pneumatique à membrane est la pompe d'alimentation, il n'est pas nécessaire d'installer le système de décharge.

 

Conclusion

Although filter presses vary in design and capacity, their installation, commissioning, and operating procedures are largely the same. Correct installation, regular maintenance, and safe operating practices not only improve filtration efficiency but also extend equipment life and reduce downtime.

If you would like to learn more about routine maintenance and troubleshooting, please refer to our Filter Press Maintenance Guide.

    Nous contacter

    Vue d'ensemble de la protection de la vie privée
    logo

    Ce site web utilise des cookies afin de vous offrir la meilleure expérience utilisateur possible. Les informations contenues dans les cookies sont stockées dans votre navigateur et remplissent des fonctions telles que vous reconnaître lorsque vous revenez sur notre site web et aider notre équipe à comprendre quelles sont les sections du site web que vous trouvez les plus intéressantes et les plus utiles.

    Cookies strictement nécessaires

    Strictement nécessaire Le cookie doit être activé à tout moment afin que nous puissions enregistrer vos préférences en matière de paramètres de cookies.

    Statistiques

    Ce site utilise Google Analytics pour collecter des informations anonymes telles que le nombre de visiteurs du site et les pages les plus populaires.

    L'activation de ce cookie nous aide à améliorer notre site web.