Mineral Processing Cases study: 100TPH Alluvial Gold (with Sticky Clay) Porcessing Plant in Pakistan. How processing plant configurated and what equipments were used? Read more…
100TPH Alluvial Gold (with Sticky Clay) Porcessing Plant in Pakistan
Published Date:11 September 2020Introduction of raw material
Raw material: alluvial gold, with sticky clay
Capacity: 100TPH
Country: Pakistan
Size: 10mm
Constituent: gold size in 0.1-1mm, contains 10-15% clay
Customer’s requirement: wash away clay and separate the gold as much as possible
Processing flow
After-sales service
Before sale
Be a good customer’s adviser and assistant, let the user’s every investment get rich returns.
(1) selection of equipment model.
(2) design and manufacture products according to customers’ special requirements.
(3) training technical personnel for customers.
Sale
Respect customers; Give customers rest assured, a relaxed, a surprise; Committed to improving the overall value of customers.
(1) product acceptance.
(2) assist the client to draw up the construction plan.
After-sale
(1) assign special after-sales service personnel to guide the installation and debugging of customers on-site.
(2) equipment installation and debugging.
(3) on-site training of operators.
Notes:
1. Services (installation, test run, training) : the supplier can provide basic drawings and schematic drawings of equipment installation. The
domestic technicians will be provided for free to guide installation and debugging, and the buyer will provide technicians with room and board.
The buyer shall prepare necessary auxiliary materials for installation.
2. Quality guarantee: the equipment is guaranteed for one year. In the warranty period, due to the quality of the product manufacturing,
manufacturers free warranty (except wearing parts).
Related Product
Contact Us Now
If you have some questions about our products, please feel free to fill out the form below, and we will contact you within 24 hours. Rest assured that we won’t reveal your information to anyone.