Mineral Processing Cases study: 15TPH Tailings Extract Lead & Barite Process Plant in Iran. How processing plant configurated and what equipments were used? Read more…
15TPH Tailings Lead & Barite Extraction Plant in Iran
Published Date:17 August 2019Introduction of the tailings process plant
Material: tailings contain lead 2% and barite 20%
Capacity: 15TPH
Country: Iran
Feeding size: 1mm
Raw mineral description: Mineral composition: 12,000 tons of tailings which contain lead 2% and barite 20%
Customers requirements: increase the lead and barite grade as much as possible
Lead extraction processing plant layout
Related machines
Equipment name | Model | Qty (set) |
Hopper feeder | / | 1 |
Vibrating feeder | GZ3 | 1 |
Belt conveyor | 800*12m | 1 |
Jig concentrator | JT4-2A | 1 |
Notes:
1. Services (installation, test run, training) : the supplier can provide basic drawings and schematic drawings of equipment installation. The
domestic technicians will be provided for free to guide installation and debugging, and the buyer will provide technicians with room and board.
The buyer shall prepare necessary auxiliary materials for installation.
2. Quality guarantee: the equipment is guaranteed for one year. In the warranty period, due to the quality of the product manufacturing,
manufacturers free warranty (except wearing parts).
Related Product
Contact Us Now
If you have some questions about our products, please feel free to fill out the form below, and we will contact you within 24 hours. Rest assured that we won’t reveal your information to anyone.