casebg

250 TPH Placer Gold Processing in Ghana

250 TPH Placer Gold Processing in Ghana

Published Date:30 August 2025

JXSC has designed a complete Flowchart and provides a full set of processing plant machines & all accessories for placer gold processing in Ghana. We offer a detailed layout design with base construction drawings accordingly.

Client’s Mine Situation

 

  1. The processing capacity required is 250TPH.
  2. The raw ore contains a significant amount of sticky clay. 
  3. Maximum feeding size: 0-300mm.
  4. Gold concentrate size: 0-6mm & 6-20mm

250 TPH Placer Gold Process Plant Flowchart

250 TPH Placer Gold Processing in Ghana Flowchart

Placer Gold Processing Plant Equipment

 

  • Vibration feeder
  • Trommel Scrubber
  • Vibrating screen
  • Mixing tank
  • Gold centrifugal concentrator
  • Shaking table
  • Vibrating sluice box
  • Slurry pump & water pump
  • Belt conveyor
  • Gold smelting furnace

Flowchat Description

 

Stage 1: Intelligent Feeding System

The processing begins with raw material being deposited into a hopper, which evenly discharges to a heavy-duty vibrating feeder. Our engineered solution features:

• Grizzly bars with 100mm spacing for automatic oversize removal

• Belt conveyor system to divert waste rock (>100mm) to stockpile

• Precise feeding of ≤100mm material to the scrubbing circuit

 

Stage 2: Advanced Washing & Classification


The ≤100mm material enters our high-efficiency trommel scrubber system:

• Powerful clay breakdown and gold liberation

• 20mm trommel screen for primary classification

  ✓ +20mm-100mm: Sent to gravel stockpile via conveyor

  ✓ 0-20mm: Further processed through:

    1. Vibrating screen for precise 0-6mm/6-20mm separation;

    2. 6-20mm stream routes directly to gold traps;

    3. 0-6mm slurry puthe mps to the concentration circuit.

 

Stage 3: High-Recovery Gold Concentration


Our multi-stage concentration system ensures maximum yield:

For 0-6mm material:

(a) Primary enrichment via dual centrifugal concentrators

(b) Secondary recovery from tails using quadruple sluice boxes

(c) Final upgrading via shaking tables

 

For 6-20mm material:

Dedicated vibrating sluice boxes for nugget recovery

 

Stage 4: Refining to Premium Gold


All concentrates undergo:

• Smelting in our high-temperature furnaces

• Production of 99%+ pure gold ingots

Proven Performance

This plant design has been successfully deployed across multiple African projects, consistently achieving:

• >90% gold recovery rates

• Low operational costs

• Minimal environmental impact

• Reliable 24/7 operation capability

Production & Shipping

250 TPH Placer Gold Processing in Ghana

JXSC is a professional mining equipment manufacturer & mining ore solution expert. It has many successful cases such as gold plants, diamond solutions, etc., If you need such a service please contact us.

Contact Us Now

If you have some questions about our products, please feel free to fill out the form below, and we will contact you within 24 hours. Rest assured that we won't reveal your information to anyone.

    Free Consultation With Our Sales And Engineering Teams





    • Your information is safe. Check our privacy notice for more details.

    • We do not offer jobs and buy or sell minerals. We ONLY sell mining equipment!

    • We have no interest in cooperation and investment!