What Does Jenny Say?

In 2024, JXSC designed and installed a 30TPH alluvial tin processing plant in Uganda, tailored for complex ore conditions featuring sticky clay and mixed coarse/fine tin concentrates. The plant achieved full production capacity within the same year, delivering high recovery rates through a multi-stage enrichment process while addressing the client’s critical need for water recycling and low-moisture tailings.

    Inquiry Now

    30 TPH Alluvial Tin Process Plant in Uganda

    1. Customer’s Tin Project Information

    Location: Uganda

    Raw ore condition: Alluvial tin mainly with a lot of sticky clay, with coarse tin concentrate and fine tin concentrates as well. Need to enrich coarse tin concentrate into fine powder to improve the grade.

    Customer’s main requirements: 30tph, a higher recovery rate as possible. High configuration. We need a dewatering machine to recycle water and tailing sand with reduced moisture content.

    2. Our Process Design & Solution

    Process Description

    Stage 1: Primary Screening & Classification

    • Excavators load raw ore into vibrating feeders equipped with 70mm grizzly screens
    • Sub-70mm material passes through for scrubbing, while oversize is rejected
    • The trommel scrubber features dual screening layers (7mm and 25mm apertures)
    • Output produces three classified fractions: 0-7mm, 7-25mm, and +25mm materials

    Stage 2: Multi-Stage Jig Separation System

    • +25mm fraction diverted directly to stockpile via conveyor belt
    • 7-25mm fraction undergoes primary jig separation:
      1. Rougher jig produces initial concentrate for cleaning jigs
      2. Closed-circuit design maximizes mineral recovery
    • 0-7mm fraction processed through dedicated jig circuit:
      1. Separate the rougher jig from the cleaner jig refinement
      2. Scavenger jig processes rougher tailings

    Stage 3: Concentrate Dewatering & Preparation

    • All jig concentrates first pass through dewatering screens
    • Screen oversize is conveyed to the hammer crusher for size reduction
    • Screen undersize is pumped to the mixing tank as slurry
    • Crusher discharge flows by gravity to the same mixing tank

    Stage 4: Final Concentration & Refinement

    • Shaking tables upgrade concentrate purity
    • Dried table concentrate passes through triple-disc dry magnetic separators
    • Final product: High-grade tin concentrate

    Stage 5: Tailings Management System

    • Combined jig and table tailings processed through:
      1. Spiral dewaterers for moisture reduction
      2. High-frequency vibration screens
    • Produces two tailings products:
      1. Coarse sand fraction
      2. Fine sand fraction

    Process Flowchart

    Uganda 30TPH Alluvial Tin Processing Plant Flowchart
    Uganda 30TPH Alluvial Tin Processing Plant Flowchart

    Main Equipment List

    • Vibrating feeder
    • Jig concentration
    • Hammer crusher
    • Spiral washer
    • Dewatering screen
    • Shaking Table
    • Belt Conveyors
    • Pumps

    3. Customer Questions & Our Answers

    Question: Can JXSC provide an agitated feed tank for the shaker table?
    Answer: Yes, we can provide the agitated feed tank before the shaker table.

    Question: Control panel layout Diagram
    Answer: We can provide the electric control panel, just additional cost will be needed. The electric wire & cable layout will be provided after the order is placed.

    Question: Installation/construction Schedule
    Answer: Installation time around 1.5 months, based on all things being ready at your side and your workers being cooperative, etc.The time for reference

    Question: Provide a basic labour schedule for the operation of the plant
    Answer: Total at least 5 persons are needed to run the plant.
    1 manager
    1 for feeding + trommel
    1 for jigs
    1 for shaking table + crusher
    1 for spiral washing +vibration screen

    Questions: Sand Pump Curves
    Answer: See the individual attachment for your reference.

    Sand Pump Curves

    4. Production, Shipping & On-site

    Uganda 30TPH Alluvial Tin Processing Plant Manufacture

    Manufacturing Photos

    Uganda 30TPH Alluvial Tin Processing Plant Delivery

    Delivery Photos

    Uganda 30TPH Alluvial Tin Processing Plant

    This project underscores JXSC’s capability to deliver high-recovery, low-waste solutions for alluvial tin miners, combining robust equipment with adaptable processes for varied ore profiles.

    Key Process Achievements

    • Advanced trommel scrubbing system with dual-layer screening (7mm/25mm) effectively removed sticky clay and pre-classified ore.
    • Multi-stage jigging circuit (roughing—cleaning—scavenging) maximized recovery of coarse and fine tin particles.
    • Integrated dewatering & water recycling (spiral dewaterer + high-frequency screens) reduced tailings moisture and minimized water waste.
    • Final purification via shaking tables and dry magnetic separators ensured high-grade tin concentrate output.

    Client-Centric Design Highlights

    • Scalable configuration: Modular layout allows future capacity upgrades.
    • Labor-efficient operation: Streamlined workflow requiring only 5 personnel for full plant control.
    • Customized automation: Optional agitated feed tanks and electric control panels provided for stable shaker table performance.

    Why The Client Chose JXSC?

    Clay-handling expertise: Specialized trommel scrubber and jigging loops adapted to Uganda’s challenging alluvial ore.

    Water management focus: Closed-loop dewatering system met environmental and operational demands.

    Proven African experience: Turnkey delivery from engineering to commissioning within 1.5 months, supported by detailed technical documentation (e.g., sand pump curves, labor schedules).

    Uganda 30TPH Alluvial Tin Processing Plant
    Uganda 30TPH Alluvial Tin Processing Plant
    Uganda 30TPH Alluvial Tin Processing Plant

    JXSC is a professional mining equipment manufacturer & mining ore solution expert. It has many successful cases such as gold plants, diamond solutions, etc., If you need such a service please contact us.

    Contact Us Now

    If you have some questions about our products, please feel free to fill out the form below, and we will contact you within 24 hours. Rest assured that we won't reveal your information to anyone.

      Free Consultation With Our Sales And Engineering Teams





      • Your information is safe. Check our privacy notice for more details.

      • We do not offer jobs and buy or sell minerals. We ONLY sell mining equipment!

      • We have no interest in cooperation and investment!