casebg

5TPH Rock Stone Gold Processing Plant in Nicaragua

5TPH Rock Stone Gold Processing Plant in Nicaragua

Published Date:16 June 2022

JXSC has provided a successful 5TPH rock stone gold processing plant in Nicaragua. We design the gold plant process flowchart & plant layout drawing according to ore conditions. How processing plant configurated and what equipment was used? Read more

Introduction of Rock Stone Gold Plant

Raw Material: Hard Quartz stone, most stone sizes are around 200mm, crush at 2mm can release the inside gold from rock.
Capacity: 5 TPH
Country: Nicaragua
Feed size: Around 200mm
Customer’s main requirements: 5tph as a small start, need a two-stage crusher, higher recovery rate .high quality machine, and fast goods delivery.

5 TPH Rock Gold Processing Plant Flowchart

5TPH Rock Stone Gold Processing Plant in Nicaragua Flowchart

5 TPH Rock Gold Processing Plant Layout

5TPH Rock Gold Processing Plant in Nicaragua Layout

Equipment Used in The Gold Processing Plant

  • Chute feeder
  • Jaw crusher
  • Hammer crusher
  • Gold centrifugal concentrator
  • Sluice box
  • Shaking table

The Layout Description

The solution is designed based on the clients mine condition and requirements.

It is configured with a hopper, and under the hopper connect with one chute feeder to give materials into the jaw crusher more evenly.

  1. The jaw crusher crushes the big stone size less than around 60mm, and the output will be transported to the hammer crusher via a belt conveyor.
  2. The first crusher crushed material goes to the hammer crusher. Hammer crusher grind materials to be fine less than 2mm.
  3. The 2mm material goes to the gold centrifugal concentrator for the first separation.
  4. Tailings of centrifugal concentrator go to sluice box for recovering more gold;
  5. Concentrates of centrifugal concentrator and sluice box are sent to shaking table for concentrating gold.

FAQ During Communication

  1. Question: Can you arrange the exportation to Managua, Nicaragua, and the shipping time?
    Answer: Absolutely YES. The shipping date from Xiamen, China to Managua, Nicaragua is around 41 days.
  2. Question: The gold centrifuges can separate the gold powder?Answer: Yes, no problem, <6mm particles are all workable for the gold centrifugal.

Below is the inside of the gold centrifugal pictures for your reference.

inside of gold centrifugal

3. Question: Do I need a mill if I bought the gold centrifugal?Answer: Need a mill or not, mainly depends on if your ore needs to grind such fine to release the inside gold or not.

With mill solution for your reference as below

mill solution

4. Question: Do you offer the engineering service for the installation guidance?
Answer: Yes, no problem. But for this plant, the machine is simple and the flowsheet is very simple. We will design the details layout drawing for you. So you can just have one who can read the drawing, then he can guide the installation. Because most equipment is assembled already. So it’s will not be difficult to install the whole plant.

Contact Us Now

If you have some questions about our products, please feel free to fill out the form below, and we will contact you within 24 hours. Rest assured that we won’t reveal your information to anyone.

Free Consultation With Our Sales And Engineering Teams





  • Your information is safe. Check our privacy notice for more details.
  • We do not offer jobs and buy or sell minerals. We ONLY sell mining equipment!
  • We have no interest in cooperation and investment!