JXSC has provided a complete set of processing plant machinery and all accessories for a Zimbabwean customer’s alluvial chrome beneficiation Plant. The client is a Zimbabwean local mine owner; they have already obtained a mining permit for the chrome mine and plan to set up a 50 TPH alluvial chrome washing plant. They have their own engineering team to set up this plant, so there is no requirement for our engineer’s site service. We offer the detailed layout design with base construction drawings accordingly.
50TPH Alluvial Chrome Beneficiation Plant In Zimbabwe
Published Date:01 June 2026Client’s Mine Situation
1. The required processing capacity for the plant: 50 TPH
2. Maximum feeding size of ROM: 50mm
3. Ore type: Alluvial chrome ore, soil type without sticky clay
4. Chrome concentrate size is 0- 2 mm
5. Average chrome grade in ROM is 25-27%
6. Target chrome concentrate grade is 48%
7. Considering the presence of magnetic iron ore in ROM, need to add a magnetic separator to reduce iron content, so that the Cr/Fe ratio can be increased.
50TPH Alluvial Chrome Beneficiation Plant Flowchart

Flowchart Detailed Explanation
1. ROM is unloaded into the raw material hopper by a loader or dump truck. The customer makes the raw material hopper with a grizzly bar 40mm to remove everything above 40mm waste, including big stone/roots/branches, etc.; below 40mm goes into the hopper, then through a belt feeder, which smoothly feeds ROM to the belt conveyor, then to the trommel screen.
2. Trommel screen is a wet screen; it has a 2 mm stainless steel screen, it can flush the soil, and screen out 0- 2 mm and above 2mm waste, which are transported to the waste stockpile by belt conveyor.
3. Less than 2mm from trommel screen is pumped to the spiral chute separator for gravity beneficiation to remove some impurities. The spiral chute separator has two stages: rougher spirals and cleaner spirals. Cleaner spirals are used to process middling from rougher spirals, aimed to increase recovery rate.
4. All concentrate from the two-stage spiral separators is sent to a magnetic separator for reducing iron content, to increase the Cr/Fe ratio.
5. The chrome concentrate from the magnetic separator is sent to a hydrocyclone by a slurry pump for dewatering concentrate.
Features of this plant design:
This flowchart design uses screening, gravity separation, and magnetic separation to reduce impurities and iron ore so as to improve the grade of chrome concentrate to meet the customer’s target grade.
This process technology is already mature and widely used in processing alluvial chrome ore; what’s more, gained most customers’ recognition and good feedback, professional & efficient & cost-effective.
This Plant Suitable for:
- Various types of sandy ore mining projects such as alluvial chrome, beach sand, alluvial tin & coltan ore, etc
- Alluvial raw ore without very much or very heavy sticky clay
- Capacity can be customized as per requirement, from small-scale(5tph, 10tph) to large-scale (100tph, 150tph, 200tph)
Not suitable for:
- Rocky ore
- Materials with very much or very heavy sticky clay
Main Machines & Accessorie Used in This Alluvial Chrome Processing Plant
| No. | Name | Model | QTY (set) |
| 1 | Belt Feeder | B650*4 | 1 |
| 2 | Trommel Screen | GT1545 | 1 |
| 3 | Spiral Chute Separator | 5LL-1200 | 21 |
| 4 | 1# Distribution Tank | 1500*1200 | 1 |
| 5 | 2# Distribution Tank | 1200*1000 | 1 |
| 6 | Magnetic Separator | CTB9018 | 1 |
| 7 | Slurry Pump | 6/4-AH | 1 |
| 8 | Slurry Pump | 4/3-AH | 2 |
| 9 | Water Pump | 150-125-250 | 1 |
| 10 | Hydrocyclone | FX350 | 1 |
| 11 | Belt Conveyor | B650*15m | 1 |
| 12 | Belt Conveyor | B650*12m | 1 |
| 13 | Diesel Generator Set | 150KW | 1 |
| 14 | Electric control cabinet | Control the start and stop of the plant equipment. Complete set of electric control panels for all machines | 1 |
| 15 | Spare Parts | 1 set of spare parts for the plant equipment | 1 |
Customer Questions & Our Answers
① Can you do a beneficiation test in your factory?
Our reply: Yes, we can do a beneficiation test in our factory.
② What is the recovery rate for the chrome wash plant?
Our reply: The recovery rate for this chrome wash plant is around 50% to 60%.
③ What is the final concentrate grade after processing by your wash plant?
Our reply: Based on your raw ore grade of 15-20%, the final concentrate grade can reach 48% plus.
④ Do you have a magnetic separator to reduce iron content from chrome ore?
Our reply: Yes, we suggest a drum-type wet magnetic separator with 1600-2000 gauss to reduce iron from chrome ore.
⑤ Do you have any technology to dewater the concentrate from the spiral wash plant?
Our reply: Yes, we suggest a hydrocyclone for dewatering the chrome concentrate.
Production, Shipping & On-site



JXSC is a professional mining equipment manufacturer & mining ore solution expert. It has many successful cases such as gold plants, diamond solutions, etc., If you need such a service please contact us.
Related Product
Contact Us Now
If you have some questions about our products, please feel free to fill out the form below, and we will contact you within 24 hours. Rest assured that we won't reveal your information to anyone.